Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the webp-converter-for-media domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/kpcr3975/public_html/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the secupress domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/kpcr3975/public_html/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the updraftplus domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/kpcr3975/public_html/wp-includes/functions.php on line 6114
AMO : Programmation d’une salle sportive multi-activités - Sol et Cité

Atelier d’urbanisme et d’architecture

Haut de page

AMO : Programmation d’une salle sportive multi-activités

MONTECH (82)

PROGRAMME

Réalisation d’une étude de programmation pour la réalisation d’une salle sportive multi-activités.

  • Programme architectural & technique
  • Études Acoustique
  • Assistance pour la consultation de la maîtrise d’oeuvre (Concours)
  • Programme réalisé en partenariat avec la commune de Montech, Fédération Française de Judo, la région et le département.

NATURE DES MISSIONS :

  • Etudes de Programmation Maîtrise d’Œuvre d’un bâtiment public
Maîtrise d'Ouvrage :

MAIRIE DE MONTECH

Maîtrise d’Œuvre :

ATELIER SOL ET CITE, OTCE INFRA , OTCE MP

Date de l'opération :

✅ Etude finalisée en 2021